Project SMX [Pic Heavy]
-
Air box upgrades are installed and I test fitted the box, here's the before and after pics;
Hopefully that will help suck in a bit more air along with the larger 34mm carb of course!!!
:grinning_face_with_smiling_eyes: :smiling_face_with_open_mouth_closed_eyes: :grinning_face_with_smiling_eyes: -
The 34mm Dellorto carb is fitted and I also fitted those other parts back on too, she's coming together nicely now;
I added the Tail tidy and wired her up, I need to order some new indicators as the one's I have look to big IMO;
And I test fitted a few parts as I was dying to see how she was coming along;
-
It's always very satisfying at this stage
Good work!
-
Boy Oh Boy - Where does the time go. Well finally after having to save up for some parts and then wait for them to finally arrive, progress has now been made.
New parts fitted;
Hel Braided Carbon brake lines.
New Galfer & Goldfern Sintered brake pads.
Stock Calipers back on.
Lithium Ion battery.
Scalvini front pipe.
FP mid pipe.
Tyga Carbon rear silencer.I had to readjust the Magura slave cylinder, as it's a tight fit on the Scalvini front pipe, but it all fits good now. I think the front pipe needs protecting so I'll look into that. More parts are on the way so hopefully there is some light at the end of the tunnel now!!! :grinning_face_with_smiling_eyes: :grinning_face_with_smiling_eyes: :grinning_face_with_smiling_eyes:
-
@Calum Thanks bud, ASAP is the best estimation I can give ATM. I'm hopeful of being able to ride her this summer, if all go's to plan. I think I'm gonna see how much it will cost to get the exhaust chromed to keep it looking shiny. I have some other parts to fit and I need to get the wheels refurbed, new decals and some other bits n' bobs. But most of the big expenses are now out of the way now. I have a new set of Conti-Attack SM Evo's to go on her as well, so I'll keep plugging away until it's BRAP BRAP Brap time!!!
-
Wheels all prepped and ready for respraying:
Primer and 2 top coats applied;
Final top coat sprayed on today;
They turned out really good for a rattle can job, so I'm very happy. I'll let the paint harden for 48 hours and then give them a quick buff up and apply 2 coats of Lacquer to seal them, which will also hopefully maintain their freshness too.
-
I resprayed a few other parts whilst waiting for the paint to dry in between coats on the wheels. I decided I wanted the yokes orange to match the frame, so I bought another set and sprayed them up;
I couldn't find another black rear mudguard, so I ended up buying a new red one and resprayed it;
Before;
After;
And finally I gave the radiator grilles some love;
-
-