The Leviathan Project
-
Ahh taking forever to pay for things LMAO.
Contrast Up'd and Vibrance Up'd to bring out the wheels on such a dull day!
It's coming together. I have had this pipe for almost three years now and this is the second time it's been on the bike would you believe.
-
@Biker_123 Cheers mate.
Yeah still lots to do. New front disc which is 150 quid alone. Wiring sorted out. Resistors for the indicators and alarm wired in. Coolant hoses and oil hoses. Rear needs building just waiting on some parts from ghe coaters. And then brakes bleeding. Needs a new chain and links taken out.
Yeah there is still plenty to do. I want to put an ASV clutch lever on but need to get one that fits.
-
@MIGHTYMAN Yeah man, I like Red anyway, I personally would have loved a 1989 Red and White DT like Seiki's as that is what got me into DT's. I got this cause it was cheap and a mint. Maybe one day in the future I will get myself one.
Nathlad had a sweet dt back in the day. I think he had the same graphics, might have been where the inspiration came from.
-
Well this was probably one of the last big expenses needed on the DT.
The front Disc.
I have wanted this for ages, but put it off due to the cost. Well it was my Bday a couple of weeks ago so this was a present from my Dad. Cheers dad.
There is literally not much left on this to do now!